Manufacture & Installation
Here at Grav Engineering we have first rate manufacturing capabilities. Our skill base covers a wide variety of production and fabrication processes.
We work on a flexible basis manufacturing to your existing designs or creating new ones to your specifications. Traditional manufacturing methods combined with modern technology and new materials make us a market leader and the natural choice for your project.
- CNC Milling
- Tubular manufacture for chassis work
- Sheet metal fabrication for vehicle body work
- Steel works for structural installations
- Casting & extrusion
- Component manufacture
- GRP moulds and mouldings
- Electrical assembly and wiring
We have invested in modern machines and have a highly skilled and dedicated workforce providing a both competitive and comprehensive service of the highest quality to meet with your specific requirements.
Grav Engineering has ISO9001 certification and our quality control and inspection processes are approved by major establishments throughout the world. This extends from manufacture through material specification to packaging and despatch.
We arrange delivery of all parts, equipment and organise our experienced team to work on site until the project is complete. We carry out a pre-installation risk assessment and work to a high standard to ensure the safety of everyone involved in the installation phase of a project.
Test & Commissioning
The test & commissioning phase follows the manufacture and installation (if applicable) of our products and rides. All products that are despatched from our workshops are tested to ensure that they are fully operational and working to their specifications prior to being packed.
All our electric vehicles are fully tested prior to being despatched to our customers. Testing includes: On and off systems, emergency stop systems, acceleration and braking, instrumentation accuracy, battery levels, charging systems, lighting systems, radio control system (if fitted).
For rides that we have installed: after the installation phase is complete or nearing completion, we run the ride, document the results and ensure that every aspect of the ride is running safely and to the design specification.
It is usually during this period that final adjustments are made, specifically to the speed and acceleration of the vehicles. The test and commissioning period will demonstrate the operational requirements of the ride and high light any shortfalls in staffing levels. This is often a good time to carry out staff training sessions prior to the official opening of the ride.
Kidz Kartz Ltd (Trading as Grav Engineering) is a registered inspection body within the ADIP scheme.
We are registered to carry out inspections and issue the annual DOCs (Declaration of Operational Compliance).